Home | Educational | Residential | Commercial | Military
  • Life Cycle Cost Analysis
    Short Version
  • Residential Catalogue
  • Safe Room Final Report from HTL Labs
Phone: 800-515-4204
For more options: Contact
Plant Operations

Field Office

Field Office Interior

Production Facility

Rail Pit

Rail Spike

Sub Contractor Warehouse

Warehouse

Warehouse Interior

6000psi concrete is poured to form a wall

A finished wall is removed from it's form

A wall is set in place at the manufacturing yard

Concrete is poured to form the floor

Concrete is poured to form the roof

Building is prepared for shipping

Building is loaded onto a truck for shipping