Niceville High School
Niceville High School
Concession Stand
800 East John Sims Parkway, Niceville, FL 32578
Scope of Work:
What makes this project unique is its location and design which allows a second story to be added at a later date . RCC engineers designed this modular unit to accommodate an additional modular unit to be added on top when needed. RCC worked hand in hand with local Contractors to complete this project on time and on budget. RCC constructed the Group Restroom/ Concession Stand in Okeechobee. It has several service lines for concessions and even baby changing stations in both the men and women’s restrooms. Local support was responsible for site adaptations, finishes and the metal roof. This facility provides service for NHS football and baseball enthusiasts.
Owner:
Okaloosa County School Board
120 Lowery Place SE
Fort Walton Beach, FL 32548
Delivery Method:
Design-Build
Status:
Completed on October 15, 2008
Building Size:
1560 sq. ft.
Seacrest Soccer Complex
Seacrest Soccer Complex
434 S. SwintonAvenue
Delray Beach, FL 33444
Scope of Work:
The SeacrestSoccer Building is a concession stand and restroom facility for the City of Delray Beach Seacrest Soccer Complex. The site is on the old Atlantic High School complex, where the original athletic fields were transformed from tennis courts and football fields into a state of the art soccer complex. Using modular building units, Royal Concrete Concepts built the building off site at the Okeechobee manufacturing facility and delivered the building within budget and under schedule. This facility exemplifies the diversity of RCC’s modular products.
Owner:
City of Delray Beach
434 S. SwintonAvenue
Delray Beach, Fl 33444
Delivery Method:
Design-Build
Status:
Completed in August 2008
Size:
1,600 SF
South Florida Fair Grounds
South Florida Fair Grounds
9067 Southern Blvd
West Palm Beach FL 33421
Scope of Work:
Frontier Land at the South Florida Fair Grounds was being renovated and restroom facilities needed to be added in a short amount of time and at the right price. Piggybacking on an existing contract saved everyone time and money. The fair grounds’ onsite staff only needed to prepare the building foundation while this dependable, low maintenance facility was 95% completed by RCC offsite, then brought out to the fair grounds on a truck and set in place with a crane. These concrete modular restrooms continue to serve the thousands of fair visitors every year and will certainly stand the test of time at the fair grounds.
Owner:
South Florida Fair Grounds
9067 Southern Blvd
West Palm Beach, FL 33421
Status:
Completed: Summer 2005
Delivery Method:
Piggy back existing Contract
Type of Construction:
RCC Modular
Size:
24 x 36 Group Restroom